Women's Curves Polo

Af JHK
Color: Black
Size

Normalpris 70,00 kr
Gratis FRAGT ved køb for mindst 40 €
Europæisk kvalitet
Betal ikke mere bare for et mærke
  • Short sleeve Polo
  • Piqué fabric
  • Buttons in the same color as the garment
  • Three-button placket
  • Side vents
Specifikation

Materiale: 100% Cotton

Grammage: 200 g/m²

Ærme: Short sleeve, With cuffs, Set-in

Pasform: Regular fit

Forarbejdning: Side seams

Certificeringer: OEKO-TEX® STANDARD 100

Vaskeanvisninger: Washable at 30°C, May be ironed, Can be chemically cleaned, Suitable for tumble drying

Label: Removable label

Materiale: Piqué

Blanding: Cotton (100%)

Certifikat
  • OEKO-TEX® STANDARD 100